TUSPIPE Production Standards
Product quality is our priority, TUSPIPE will never fail to live up to customers’ trust!
TUSPIPE Standards
tUSPIPE laboratory
In order to maintain good pipe quality, TUSPIPE has established a Test & Inspection Center since 2004. With a series of state-of-the-art tests and inspection equipment, the test & inspection center is able to perform the tensile tests, hydro tests, impact tests, DWTT, etc.
The laboratory has passed the assessment of the China National Accreditation Committee for Conformity Assessment and successfully obtained the CNAS laboratory certification. The test results from the lab are recognized by 35 management system accreditation institutions and 54 laboratory accreditation institutions from other countries, which fully illustrated the authority of the inspection activities. So far, the company has successively obtained the qualification honors of “Enterprise Technology Center” and “Key Laboratory of Welded Steel Pipe”, and also the “Key Technology Research and Development Center” cultivated by Tianjin Municipality.
Certificates
tuspipe QUALITY CONTROL Procedure
Supplier Management
TUSPIPE carries out a strict audit on suppliers, checking their production qualification and capacity to ensure that the quality control procedures of raw materials meet the requirements. In addition, the company also evaluates the suppliers every year and evaluates the past quality control, document control, delivery time, and other information to ensure that the suppliers meet our product quality requirements.
Before Production
After receiving the hot-rolled coil of raw materials, the quality assurance department sends an inspector for visual inspection, to eliminate cracks, pits, and other defects on the surface of the coil to affect the subsequent production. In addition to visual inspection, the inspection personnel also takes samples from the coil plate for chemical composition analysis and mechanical experiment according to the standard requirements, and compare the inspection results with the data on the material quality certificate issued by the coil plate supplier. If the analysis results do not meet the requirements of the standard, the raw material will be returned to the supplier for replacement.
During Production
In order to ensure that our steel pipes meet the standard requirements, the quality engineers, on-site inspection personnel and front-line production workers need to make great efforts. In the production process, we will carry out the following inspection and test on the steel pipe according to the standard requirements:
Tensile Test
Metallographic Test
Charpy Impact Test
Chemical Component Analysis
Drop-Weight Tear Test
Flattening Test
Hydrostatic Test
NDT Test
Coating, Marking, and Packaging
After the steel pipe production is completed, TUSPIPE performs the surface coating of the steel pipe according to the customer’s requirements, so as to prevent corrosion. Common coated with black paint, varnish, and anti-rust oil, these materials can play a temporary anti-rust effect in the process of transportation. If FBE, PE, or PP coatings are needed, the pipes will be transported and finished in a coating mill.
TUSPIPE sticks a bar code on the inner wall of each steel pipe, and the bar code is unique on each pipe. The bar code is equivalent to the ID card of each unit under the steel pipe, which records the heat number, tube number, steel grade, and production information of each pipe. After finishing the coating process, the production workers scan the bar code to obtain the corresponding product information and mark pipes according to the standard and contract requirements to ensure the traceability of the product.
Generally speaking, the packaging of products plays a crucial role in the protection of products during transportation, so the company is also very concerned about this process. According to the size, coating, and other processing information of steel pipe, the company usually uses end caps, PVC wrap, nylon sling, galvanized strip, fumigated wood, and other materials to protect the steel pipe. At the same time, the engineers can generate a customized packing scheme since some of our customers need more solid, stable, easy to unload packaging solutions.
Before Shipment
Before delivering to the customers, the inspector re-checks the appearance, packaging, marking label, tag, and other specifications of the steel pipe to ensure that the customer will not receive any defective products. After passing the inspection, the quality assurance department issues a mill test certificate according to each batch of shipped products.